![]() These terms and conditions outline the rules and regulations for the use of Sewer-Man's Website.īy accessing this website we assume you accept these terms and conditions in full. Our advertising and analytic partners include: Google Analytics, Google AdWords, and various others.īy using our website, you hereby consent to our Privacy Policy and agree to its Terms and Conditions. Please refer to their respective privacy policy for information regarding their cookies. Some of advertising and analytic partners on our site may use cookies. Cookie information is used to optimize the visitors experience by customizing our web page content based on visitor’s browser type and/or other information. These cookies are used to store information including visitor’s preferences, and the page’s visitors accessed on the website. The purpose of the information is for analyzing trends, and administering the site. These are not linked to any information that is personally identifiable to the visitor (you). The information collected in the log files include internet protocol (IP) addresses, browser types, Internet Service Provider (ISP), date and time stamps, and referring/entrance/exit pages. These files log visitors when they visit websites. follows a standard procedure of using server log files. If you have additional questions or require more information about our Privacy Policy, do not hesitate to contact us through email at Log Files This Privacy Policy document contains types of information that is collected and recorded by and how we use it. Sewer-Man does not sell, rent, or exchange any information collected via. If you have difficulty viewing any page with adaptive technology please call us at 800-SEWERMAN or email us at for additional assistance.Īt Sewer-Man, one of our main priorities is the privacy of our visitors. You may use the screen reading capabilities of Adobe Acrobat Reader to allow vision impaired visitors to access any PDF content. While we strive to include accessible versions of all new content for screen-readable devices, some of the legacy content on the site may not be as readily accessible. The WAVE Web Accessibility Evaluation Tool is used during development to help implement the guidelines.HTML5 and ARIA tags have been used to help describe the page content.CSS styles have been used so users may override styles in their browsers for font sizes and colors.Heading tags have been used to help structure the page content.Descriptive alt attributes have been included for most image content.We have taken the following steps in accordance with those guidelines: In our efforts to make this website accessible to those with disabilities we are continually working toward implementing as many of the Web Content Accessibility Guidelines (WCAG) 2.0 as possible. Rooter-Man is committed to making our website accessible to everyone including those with disabilities. Some services are only offered at participating locations. We use state of the art technologies to create a long lasting septic system that will serve you for years to come. It is also during this stage that water tests, pressure testing, vacuum testing and even leak testing of the tank are done before it is finally backfilled.Īt SewerMan of Glen Head, NY we perform septic system design and installation services. The next phase is to backfill the septic tank or vaults and the pipes. Once the excavation is finished, a final inspection will be made by the health inspector before the backfill. During the excavation, your contractor should pay continuous attention to elevation to get the best result. The next step in the construction stage is the excavation of the site where the septic tank and pipe drains will be buried. The first step in the installation and construction process is the creation of a simple layout of the system that will be used to transfer the septic system design from the paper to the ground.-The layout as well as the position of every septic system component on the design should be transferred onto the site. Septic system installation and construction stage – Once the permits are issued actual installation and construction can begin. The septic system design should include the layout of the drain field, the size of the drain field trenches and the size of the septic tank. Septic system design stage – In the design stage, the design engineer prepares the plan set or system design set together with the application report for submission and presentation to the local health office for approval. The Two Stages in Septic System Design and Installation
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |